Although this is was a small apartment the reconstruction and renovation was complex as a space was recuperated from the unused ground floor .This area before work began was insalubrious and subject to high water. The storeroom was restored and a tidal container tank used to protect from high water was installed . A bathroom was built along with making the room independent thus adding an unexpected additional space to the house. The superior floor space was redistributed creating a modern living area with Venetian flooring in pale tones and a bathroom that was completed with large pieces ceramic and a mosaic of iridescent strips.