The reconstruction that we faced for this job regarded the complete overhaul of the entire palace. As well as the historical 20th century annex which was left in a state of abandon for over half a century. The client wanted a complete restoration involving structural intervention from the foundations to the luxurious finishing’s chosen for the entire building.
The project was completed with the permits given from the relevant departments to complete nine apartments.
In brief the intervention was as follows:
A period building with an independent entrance .Despite its peculiarities it was possible to obtain a more modern design ln line with the rest of the property.